WEEK 28: Ongoing Repair Works on Third Mainland Bridge:https://twitter.com/Mr_JAGs/status/1358161228292628483?s=19
We are happy to tell you that our work is almost done. A lot of removals and casting of new joints to make sure the bridge is strong and safe for everyone
The Federal Controller of Works, Lagos State was also on ground to ensure that quality was maintained and delivery/handover would be on schedule.
Please bear with us just a little more.
Follow @tmbrehab #Tmbrehab for more updates
https://www.youtube.com/watch?v=whRFI4-4ihI
source http://www.nairaland.com/6402910/update-third-mainland-bridge-repairs
No comments:
Post a Comment